International: englishInternational: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Romania: românesc
Romania: românescRomania: românesc
Poland: polski
Poland: polskiPoland: polski
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Italy: italiano
Italy: italianoItaly: italianodeutsch
France: français
France: françaisFrance: français
Spain: español
Spain: españolSpain: español
International: english
International: englishInternational: english
Germany: deutsch
Germany: deutschGermany: deutsch
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
Canada: english
Canada: englishCanada: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
UAE: english
UAE: englishUAE: english

DKDenmark: danskseSweden: svenskahuHungary: magyar

Saale-Elster Viaduct

Halle (Saale), Germany

In the bridge structure, the Stabox® special rebar connection for high shear forces were able to guarantee the most demanding requirements for an "indented" working joint.

The Saale-Elster Viaduct is a railway overpass on the new Erfurt-Leipzig / Halle line and is located south of Halle. The prestressed concrete bridge was built between 2006 and 2013. Over six kilometres long and with a branch of more than two kilometres on the bridge construction, the valley bridge is the longest bridge structure in Germany.

The customer required a "rough" reverse bending connection for the high shear stress in the joint direction. This was achieved with the special "indented" Stabox® T connection.

Thanks to the stable trapezoidal sheet of the box, the Stabox® T rebend connection for very high shear stress in the joint area meets the maximum requirements for an "indented" working joint according to DIN EN 1992-1-1 with NA (D) - Type Test Report dated 09.08.2013.

This custom solution was also achieved in rapid time through the close cooperation between MAX FRANK Anwendungsstechnik and the building contractor.

Type of building:

Bridge

Building contractor:

ARGE from the companies Hochtief, Adam Hörnig and Gerdum and Breuer

Completion:

2013

Products used
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies. By continuing to use the website, you agree to the use of cookies.  For more information, see the cookie notes.